University of Arkansas · NED³ · public screening demonstration

RetailFlex Decision Studio

Representative Northwest Arkansas SuperMarket prototype · annual EnergyPlus simulations · Track A product workflow

Open the RetailFlex Climate Atlas →
Public TMY3 station metrics for weather-file selection and climate screening.

Decision path

Each stage increases the permitted claim only when the necessary evidence is present.

Scenario trade-space

Select a simulated case to inspect its change relative to the prototype baseline. This view does not calculate tariff cost, savings, comfort, or operational feasibility.

Annual electricity versus annual peak

Selected case

Illustrative peak-day comparison

Selected summer event day: ; modeled event window: . Hourly facility electricity is presented as average kW.

CaseAnnual site electricityAnnual peakEvent-window energyScreening decision

Readiness gate — synthetic example only

This metadata example demonstrates the gate logic. It contains no owner, site, model, utility, tariff, or BMS data.

Bounded measure library

A measure remains a screening candidate until its listed inputs and approval gate are satisfied.

MeasureStatusPhysical/operational mechanismMinimum inputsApproval gate

Measure explorer

What a real assessment needs

  • Controlled model revision, store format, HVAC/refrigeration configuration
  • 12 months of interval whole-building electricity and the applicable tariff
  • Operating schedules, temperature/operations constraints, and meter boundary
  • Approved read-only BMS trends and point dictionary where relevant

Appropriate next action

Approve a limited data-and-operations scoping meeting and complete the local intake manifest. The workflow can recommend collecting data, redesigning a measure, or rejecting a scenario; it does not request live control.