RetailFlex Decision Studio
Representative Northwest Arkansas SuperMarket prototype · annual EnergyPlus simulations · Track A product workflow
Open the RetailFlex Climate Atlas →
Public TMY3 station metrics for weather-file selection and climate screening.
Decision path
Each stage increases the permitted claim only when the necessary evidence is present.
Scenario trade-space
Select a simulated case to inspect its change relative to the prototype baseline. This view does not calculate tariff cost, savings, comfort, or operational feasibility.
Annual electricity versus annual peak
Selected case
Illustrative peak-day comparison
Selected summer event day: ; modeled event window: . Hourly facility electricity is presented as average kW.
| Case | Annual site electricity | Annual peak | Event-window energy | Screening decision |
|---|
Readiness gate — synthetic example only
This metadata example demonstrates the gate logic. It contains no owner, site, model, utility, tariff, or BMS data.
Bounded measure library
A measure remains a screening candidate until its listed inputs and approval gate are satisfied.
| Measure | Status | Physical/operational mechanism | Minimum inputs | Approval gate |
|---|
Measure explorer
What a real assessment needs
- Controlled model revision, store format, HVAC/refrigeration configuration
- 12 months of interval whole-building electricity and the applicable tariff
- Operating schedules, temperature/operations constraints, and meter boundary
- Approved read-only BMS trends and point dictionary where relevant
Appropriate next action
Approve a limited data-and-operations scoping meeting and complete the local intake manifest. The workflow can recommend collecting data, redesigning a measure, or rejecting a scenario; it does not request live control.